At the CMM site:
- Re-grading of the existing tailings area including waste rock within the tailings.
- Demolition, transportation, and burial of concrete foundations.
- Removal and recycling of scrap metal and mining equipment.
- Drainage channel construction, placement of a soil cover, and revegetation.
- Placement of deadfall and wooden/organic debris over the finished areas.
At the GT site:
- Construction of a temporary access road from PR 314 to the tailings area.
- Re-grading of the existing tailings area, drainage channel construction
- Placement of a soil cover and revegetation over all disturbed areas.